Rocket Lab
Electron, Neutron, Photon buses, spacecraft components. Based in Long Beach, CA, US, founded 2006 by Peter Beck.
- Where
- Long Beach, CA, US
- Founded
- 2006
- Notable investors
- Beck Peter, VANGUARD GROUP INC, VK Services, LLC, Khosla Ventures V, L.P., KHOSLA VENTURES SEED B, L.P. disclosed holders above 5%, from SEC filings
rocketlabusa.com → Wikipedia →
No chief executive on record here. We show a name only where we can point at the page it came from.
$37.0B market value
$63.91 a share on Jul 24, 2026, multiplied by 579 million shares from their 10-Q dated Apr 30, 2026.
- Price
- $63.91 on Jul 24, 2026
- Shares outstanding
- 578.8M as of Apr 30, 2026
- Source of the count
- 10-Q
- Product
- $37.0B
Price, 252 sessions
Who holds a disclosed stake
| Holder | Filings | Most recent | Form |
|---|---|---|---|
| Beck Peter | 1 | Mar 30, 2026 | SCHEDULE 13D/A |
| VANGUARD GROUP INC | 1 | Mar 27, 2026 | SCHEDULE 13G/A |
| VK Services, LLC | 1 | Feb 17, 2026 | SCHEDULE 13D/A |
| Khosla Ventures V, L.P. | 1 | Nov 20, 2025 | SCHEDULE 13D/A |
| KHOSLA VENTURES SEED B, L.P. | 2 | Oct 23, 2025 | SCHEDULE 13D/A |
| BlackRock, Inc. | 2 | Oct 17, 2025 | SCHEDULE 13G |
Disclosure is required above 5% and again on a material change, so a holder appearing more than once has amended its position rather than necessarily added to it.
Filings that report a transaction
| Filed | Form | What it is |
|---|---|---|
| Jul 8, 2026 | 4 | Insider transaction |
| Jun 29, 2026 | 8-K | Material event 1.01,7.01,9.01 |
| Jun 18, 2026 | 4 | Insider transaction |
| Jun 5, 2026 | 4 | Insider transaction |
| Jun 5, 2026 | 4 | Insider transaction |
| Jun 5, 2026 | 4 | Insider transaction |
| Jun 5, 2026 | 8-K | Material event 5.02 |
| Jun 2, 2026 | 4 | Insider transaction |
| Jun 2, 2026 | 4 | Insider transaction |
| Jun 1, 2026 | 4 | Insider transaction |
| Jun 1, 2026 | 4 | Insider transaction |
| Jun 1, 2026 | 4 | Insider transaction |
| Jun 1, 2026 | 4 | Insider transaction |
| May 28, 2026 | 4 | Insider transaction |
| May 28, 2026 | 4 | Insider transaction |
| May 28, 2026 | 4 | Insider transaction |
| May 28, 2026 | 4 | Insider transaction |
| May 28, 2026 | 4 | Insider transaction |
| May 22, 2026 | 4 | Insider transaction |
| May 22, 2026 | 4 | Insider transaction |
Twenty most recent of 32.
Patent activity
The record holds 24 filings, 8 in the spacecraft class. A filing dates the work, not its arrival: a grant is usually the same invention two or three years older. Full patent desk →
| Filed | Title | Class |
|---|---|---|
| Aug 12, 2022 | ROCKET ENGINE INJECTOR | 60/204 |
| Aug 8, 2022 | JETTISONABLE BATTERY SYSTEMS FOR POWERING ELECTRICAL TURBOPUMPS FOR… | 60/205 |
| Sep 3, 2021 | SATELLITE DEPLOYER WITH COMPOSITE GUIDE RAIL | 244/173.3 space |
| Jun 18, 2021 | SATELLITE DEPLOYER DOOR WITH CLUTCH BEARING | 244/173.3 space |
| Jun 9, 2021 | ROCKET ENGINE TURBOPUMP WITH COOLANT PASSAGE IN IMPELLER CENTRAL HUB | 60/204 |
| Jun 9, 2021 | SATELLITE DEPLOYER WITH EXTERNALLY ADJUSTABLE PAYLOAD RESTRAINT | 244/173.3 space |
| Jun 9, 2021 | TURBOPUMP, THRUST CHAMBER, AND INJECTOR WITH DISTRIBUTION SYSTEM AND A… | 60/204 |
| Jan 21, 2021 | SATELLITE DEPLOYER DOOR RELEASE MECHANISM | 244/173.3 space |
| Jun 17, 2020 | ROCKET ENGINE TURBOPUMP WITH COOLANT PASSAGE IN IMPELLER CENTRAL HUB | 60/204 |
| Mar 27, 2020 | JETTISONABLE BATTERY SYSTEMS FOR POWERING ELECTRICAL TURBOPUMPS FOR… | 60/205 |
| Jan 6, 2020 | ROCKET ENGINE THRUST CHAMBER, INJECTOR, AND TURBOPUMP | 60/204 |
| Aug 3, 2018 | SATELLITE DEPLOYER WITH COMPOSITE GUIDE RAIL | 1/PCT.003 |
Twelve most recent of 24.
On the record 3 claims
- Missed All in all, we continue to push extremely hard for end-of-year launch. End of 2025
- Achieved We expect revenue in the first quarter to range between $185,000,000 and $200,000,000. Q1 2026 results
- Pending Neutron's first launch is now targeted for Q4 2026. Q4 2026
Of these, 1 missed, 1 pending, 1 achieved. Each claim's full quote, source and evidence is on Worth keeping an eye on.